News & Views

Discover GridServe’s updated news. Read expert industry insights, engineering updates, and project highlights on BESS and grid connection across Australia.

Data Centres Grid Connection

Data Centres Are Becoming Grid Risk Assets: What the New AEMC Draft Rules Mean

Data Centres Are Becoming Grid Risk Assets: What the New AEMC Draft Rules Mean Farayi Nyausaru May 18, 2026 AEMC & Grid Connection 6 minute read Hyperscale data centres are now treated by the AEMC as active grid participants, not passive loads. Key facts at a glance New NER threshold 30 MW Triggers the new technical […]

Soil Resistivity Testing

Soil Resistivity Testing in Victoria for Earthing Design and DNSP Connections

Soil resistivity testing is a key input for safe and compliant earthing design. GridServe provides Wenner method soil resistivity testing and earthing design reporting for solar, BESS, EV charging, commercial developments and utility connection projects across Victoria. Our reports are prepared for use in DNSP connection applications and earthing studies, including projects connected to AusNet, […]

1753783911194

Key Considerations for Lightning Protection Design in Australia

Australia experiences some of the most intense lightning activity in the world. For commercial, industrial, and infrastructure assets, a robust Lightning Protection System (LPS) is not just a safety requirement — it is an essential investment in business continuity. Designing a system that meets Australian Standards (AS1768:2021) requires a deep understanding of local conditions, risk […]

Earth Grid Design

Key Considerations for Earth Grid Design in Australia

A well-engineered earth grid is the foundation of every safe electrical installation. In Australia, where fault currents can be enormous and site conditions range from wet coastal clay to bone-dry outback rock, getting earthing design right is one of the most technically demanding tasks in power engineering. At GridServe, we design and model earth grids […]