Leongatha Dual BESS Grid Integration & Feeder Reconfiguration Study
Gridserve performed a high-level steady-state network assessment for two proposed 4.99MW Battery Energy Storage Systems (totalling 9.98MW) in Leongatha. The project involved complex modelling to integrate dual