GridServe performed a high-level steady-state network assessment for two proposed 4.99MW Battery Energy Storage Systems (totalling 9.98MW) in Leongatha. The project involved complex modelling to integrate dual high-capacity inverters into the AusNet 22kV distribution network, ensuring grid stability across multiple switching configurations.

Key Project Scope & Deliverables

  • Dual-Site Impact Assessment: Analysed the simultaneous operation of two independent BESS units connected to the Leongatha Zone Substation, evaluating their cumulative impact on feeder thermal limits and voltage stability.
  • Network Reconfiguration Modelling: Evaluated two distinct switching scenarios to optimize the connection path. Identified that transitioning a portion of the feeder through strategic switch automation significantly reduced required conductor replacement lengths and improved the overall voltage profile.
  • Thermal & Voltage Remediation: Developed a comprehensive reconductoring strategy to address initial “Fail” results in thermal loading and steady-state voltage variations.
  • Advanced Trip & Variation Analysis: Validated that a simultaneous 100% generation trip of both BESS units would maintain voltage variations within the strict limits required by the Network Service Provider (NSP).
  • Long-Term Sensitivity Studies: Conducted 10-year forecasted modelling to ensure the dual-BESS configuration remains compliant with future load growth and network evolution through 2031.
  • Control Strategy Optimization: Verified the effectiveness of Power Factor Control mode in mitigating voltage profile deviations during both high-demand import and low-demand export cycles.

Key Challenges

  • Pre-existing Non-compliance: Navigating a project where the existing network already exhibited voltage profile deviations, requiring detailed analysis to prove the BESS would not materially exacerbate these conditions.
  • Complex Switching Logic: Balancing the benefits of feeder reconfiguration against traditional infrastructure upgrades to achieve the most cost-effective path to compliance.
  • Simultaneous Operation Hazards: Modelling “worst-case” scenarios where both 4.99MW systems operate at peak capacity, ensuring no localized overloading or excessive voltage rise at the Points of Connection (PoC).

Technical Standards Followed

  • NER (National Electricity Rules): Generator Performance Standards (GPS).
  • AusNet Services Technical Standards: 22kV Distribution network guidelines.
  • AS/NZS 3000: Electrical installations.

Written by

<div class="elementor-element elementor-element-0c15f3f elementor-widget elementor-widget-text-editor" data-id="0c15f3f" data-element_type="widget" data-e-type="widget" data-widget_type="text-editor.default"> <p class="team-bio">Anil Chaudhary is an experienced electrical engineer and energy infrastructure professional with extensive expertise in power systems, renewable energy, and battery energy storage systems. He combines strong technical capability with strategic leadership, having worked with major Australian utilities and infrastructure organisations across the design, engineering, and delivery of critical energy and telecommunications projects.</p><p class="team-bio">Anil has held senior leadership roles including General Manager at RSS CommTel, leading major infrastructure programs and operational teams. At GridServe, he leads engineering strategy, project delivery, and client partnerships.</p><div class="team-section-label">Key expertise</div><ul class="expertise-list"><li>Battery Energy Storage Systems (BESS)</li><li>Solar PV integration</li><li>Power system studies</li><li>Earthing system design</li><li>Lightning protection design</li><li>Grid compliance assessments</li><li>Engineering strategy & project delivery</li></ul> </div><h3 class="elementor-heading-title elementor-size-default">Past organisations </h3><div class="bio-bottom-list elementor-element elementor-element-d87ceed elementor-icon-list--layout-inline elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list" data-id="d87ceed" data-element_type="widget" data-e-type="widget" data-widget_type="icon-list.default"> <ul class="elementor-icon-list-items elementor-inline-items"> <li class="elementor-icon-list-item elementor-inline-item"> <span class="elementor-icon-list-text">Power & Water Corporation</span> </li> <li class="elementor-icon-list-item elementor-inline-item"> <span class="elementor-icon-list-text">AusNet Services</span> </li> <li class="elementor-icon-list-item elementor-inline-item"> <span class="elementor-icon-list-text">Ausgrid</span> </li> <li class="elementor-icon-list-item elementor-inline-item"> <span class="elementor-icon-list-text">Telstra</span> </li> <li class="elementor-icon-list-item elementor-inline-item"> <span class="elementor-icon-list-text">RSS CommTel</span> </li> </ul> </div>